Fields marked with * are mandatory
Paint Sludge Separation System
Address

1. Please provide the drawing of existing pit indicating the length x width x depth, water level and water entry and exit point to pit from booth? Also indicate the partitions and filters if any in the pit
2. Booth water circulation pump capacity?
3. Working hours per day?
4. Quantity of Paint used/day?
5. Type of paint being used?
6. Is there space available close to the pit for installation of the system?
7. How you are removing sludge currently or which systems is use?
Enter the code *